CORPORATE / COMMERCIAL PROJECTS
AIRSIDE BUSINESS PARK - POST TENSION GARAGE | Moon Township, PA
Owner The Elmhurst Group
Architect Baker and Associates
Cost $2,500,000



The Owner contracted Burchick Construction Company, Inc. on a design-build basis to provide a two-story parking structure for 250 parking spaces. The structure was built over existing on grade parking. The structure was designed by VSL Structural Engineers. Burchick Construction self-performed the concrete and excavation. The project was performed under a Guaranteed Maximum Price delivery system with an overall savings provided to the Owner.